Project Details
Contact Us
Date Completed
January 2018 – December 2020
Budget
$200 million
Contractor
Hacer
Location
Melbourne, Victoria
Eastbrunswick2 1

Stilcon Scaffolding provided a perimeter scaffolding 25 to 30 metres high with full wrap to create protection while the building was in construction. The team provided survey points to build the scaffold for the one build but two process build where the structures team and the finishing trades could work together. The encapsulation also helped reduce falling hazards.

This project saw the team working on a site of 1.8 hectares and logistically providing 2000 tonnes of scaffolding while needing to work with their cranage and structural team, across three separate apartment builds from the ground to 30 metres high. Our design and engineering team reviewed the architectural of the building and supplied issued for construction drawings. This ensured the client could understand the parameters of the perimeter scaffold and how it met their unique requirements to be able to work in and out at the different levels of the façade of the three buildings. To achieve accuracy and additional safety, Stilcon Scaffolding supplied its own surveying team to pinpoint the scaffold from the grid lines – this ensured the structural team got the safe perimeter scaffold while the finishing trades team were working on a safe scaffold. 

This innovative thinking it lead to a cost effective option for Hacer, as it now had two scaffold purposes within the one set out.

Stilcon Scaffolding executed a safe practice scaffold with encapsulation. Our team brings extensive experience to each project, and it enabled us to create efficiencies and cost savings for this job. These efficiencies then enabled us to complete the project under budget and inside the client’s timeline.

The immense size of this project and many logistical considerations meant the team needed to ensure multiple safety elements were delivered at all stages of the build and dismantle, while working alongside the client’s team on site. It was extremely important that the Operations team where able to meet the clients deadline while ensuring best practice safety behaviours were being enforced, working at such heights.

We’re reliable, we’re respectful and we take responsibility.

Testimonials

Logo
Stilcon 1 White

Stilcon Scaffolding now Stilcon Industrial Services

Stilcon Industrial Services

Share This

Select your desired option below to share a direct link to this page.
Your friends or family will thank you later.